Department of Industries and Commerce, Government of Rajasthan
Government
Open

Rajasthan Sunrise Captive Power Waiver Scheme — 100% Power Charge Waiver — Eligibility Criteria

Eligibility

Rajasthan Sunrise Captive Power Waiver Scheme — 100% Power Charge Waiver is open to startups registered in India. The full eligibility criteria — qualifying sectors, states and entity types — are below.

Who can apply

The scheme is open to Sunrise Enterprises as defined under Section 3.3.1.1 of the Rajasthan Investment Promotion Scheme 2024. A unit that does not fall within that definition cannot claim this waiver.

  • The captive power plant has to be put up inside Rajasthan.
  • The power produced must be consumed captively by the enterprise itself — selling it to a third party is not allowed.
  • The incentive is limited to the first three units established by an enterprise. Green Hydrogen projects are carved out of this three-unit benefit and are governed by their own terms, even though Green Hydrogen is itself treated as a Sunrise sector.
  • The plant's size cannot exceed a 200% ceiling, raised to 250% for Green Hydrogen projects.

Compliance with the captive-consumption condition and the size ceiling is checked as part of the verification exercise, so both should be built into your project plan from the start.

Rajasthan Sunrise Captive Power Waiver Scheme — 100% Power Charge Waiver is open to startups at any stage. The programme is targeted at startups registered in Rajasthan. Applicants should be registered as private limited, llp and opc.

Rajasthan
Eligible stage
Any stage
Location
Open to startups registered in India
Entity type
Private Limited, Llp, Opc, Partnership, Proprietorship

← Back to Rajasthan Sunrise Captive Power Waiver Scheme — 100% Power Charge Waiver overview