Rajasthan Captive Power Charges Waiver: 100% Relief for Manufacturers — Eligibility Criteria
Rajasthan Captive Power Charges Waiver: 100% Relief for Manufacturers is open to startups registered in India. The full eligibility criteria — qualifying sectors, states and entity types — are below.
Who can apply
Two things decide whether an enterprise can use this incentive: its standing under RIPS 2024, and the way the generated power is consumed.
- The applicant must be a Regional Anchor or Sectoral Anchor in the manufacturing sector.
- The captive power plant has to be set up by that manufacturing enterprise itself.
- Everything generated must go towards captive consumption. Third-party sale is not allowed.
- Plant capacity is capped at 200% of the connected load of the unit.
- Full banking is permitted, and withdrawals are not restricted during peak hours.
For 'behind the meter' Renewable Energy plants, two relaxations apply:
- There is no ceiling on maximum generation capacity.
- Electricity Duty (ED) exemptions apply in perpetuity, provided nothing is exported to the grid in off-peak hours.
Rajasthan Captive Power Charges Waiver: 100% Relief for Manufacturers is open to startups at any stage working in industrial goods. The programme is targeted at startups registered in Rajasthan. Applicants should be registered as private limited, llp and partnership.
- Eligible stage
- Any stage
- Location
- Open to startups registered in India
- Entity type
- Private Limited, Llp, Partnership
← Back to Rajasthan Captive Power Charges Waiver: 100% Relief for Manufacturers overview